PUSSY_CAT_CCS_CARPENTRY
Monday, 13 June 2011
8kn straps
Today me and Keron finished off the centre ceiling brace and the we fixed on 8kn connector plates to the roof.
steel shed
Today we unsrewed this steel shed and straped them up and put it away for the next class to build it. After i done that i went back on site to help mason and sonny to fix the out riggers on to the fly rafters.
Tuesday, 31 May 2011
Scaffolding
Today all on site setting up the scaffolds,we separated and half of the boys started setting out the length of the house while me,pereri,afe,zeethan,mana and
charles finished off what we stared yesterday. First we made sure all the poles had soul plates underneath and made sure that the poles were straight then after that we put the brace for the bottom on then after that we put the put-logs on to straighten the whole scaffold.
charles finished off what we stared yesterday. First we made sure all the poles had soul plates underneath and made sure that the poles were straight then after that we put the brace for the bottom on then after that we put the put-logs on to straighten the whole scaffold.
Ceiling Batterns
Today we put up our Ceiling Batterns up The other Boys pu up the Batterns While Marty Taught me,pereri and erin hoe to set a scafold.
Sunday, 29 May 2011
Setting out our own Wall Frame.
25/05/2011
Today we learnt how to set out a wall frame on site. I learned that its is better to mark both top and bottom plate together when laminated to have correct measurements when nailing in the studs.
Today we learnt how to set out a wall frame on site. I learned that its is better to mark both top and bottom plate together when laminated to have correct measurements when nailing in the studs.
Monday, 23 May 2011
Wall frames up
24/05/2011
Today we finished off richards flooring while Marty marked out where our wall frames goes, Once we finished marking we set up the walls according to the plan, and then used a straight edge to square the corners. Then finaly when the wall frames wer up all the boys nailed the frames together and then left me and erin with the straight edge to square all the corners of the frames.
Today we finished off richards flooring while Marty marked out where our wall frames goes, Once we finished marking we set up the walls according to the plan, and then used a straight edge to square the corners. Then finaly when the wall frames wer up all the boys nailed the frames together and then left me and erin with the straight edge to square all the corners of the frames.
yay finished the flooring
today was happy to finish off the flooring thanks to marty for showing us our values to pump the boys to work harder.Once we finnished the flooring we help richard with their floorong.
Starting on noggs
Today was finishing the floor joist and getting on to noogings, measuring the noggs and then cutting it on the drop saw.
Joist paln
Today we wer fixing our joist onto our bearers but first we layed it down according to the plan seperating our wet areas to our dry areas to make evrything easier.
Straightning Bearers
02/05/2011
Today we straighten the bearers using a string line that was tied on a nail on 1 side of the building and then it was run down the length of the building to the other end and tied on a nail there then the bearers we straighten.
Today we straighten the bearers using a string line that was tied on a nail on 1 side of the building and then it was run down the length of the building to the other end and tied on a nail there then the bearers we straighten.
Tuesday, 12 April 2011
BEARERS
12/04/2011
Today we fixed the jack studs to the sole plate after that we laminated the bearers together then fixed the bearers onto the jack studs.
TOOL USED. Drop saw, hand saw, nails, hammer, level, saw stool, dumpylevel, combination square, 1m ruler, measuring tape, skill saw, pencil.
Today we fixed the jack studs to the sole plate after that we laminated the bearers together then fixed the bearers onto the jack studs.
TOOL USED. Drop saw, hand saw, nails, hammer, level, saw stool, dumpylevel, combination square, 1m ruler, measuring tape, skill saw, pencil.
Sunday, 10 April 2011
PROFILES
06/04/2011
Today we learnt how to use a dumpylevel, and practise how to set up levels for the (F.F.L) and how to find the corner of the house.
TOOL USED;dumpylevel, hammer, stringline, pegs, batter boards, nails, sledge hammer, measureing tape, ruler, ect.
Today we learnt how to use a dumpylevel, and practise how to set up levels for the (F.F.L) and how to find the corner of the house.
TOOL USED;dumpylevel, hammer, stringline, pegs, batter boards, nails, sledge hammer, measureing tape, ruler, ect.
Monday, 4 April 2011
SITE SAFE
04/04/2011
Today we had a site safe trannier come in and teach our class the information in how to keep ourself safe in any site aswel as keeping others safe.
Today we had a site safe trannier come in and teach our class the information in how to keep ourself safe in any site aswel as keeping others safe.
CONTINUE OF FIRST AID
Today we learnt ways of saving other peoples life but insureing that the area is clear from danger for our own welbeing,For example when a persons in a fire first insure your own safety then save the person then tret him like the example on this video.
FIRST AID
29/03/2011
Today we learnt how to safely rescue and save someones life when in danger useing C.P.R,CPR IS USED BY EVERYONE WHEN IT COMES TO RESTARTING THE HEART CIRCULATION AND RESPIRATION.FOX EXAMPLE IN THE VIDEO ABOVE.
Today we learnt how to safely rescue and save someones life when in danger useing C.P.R,CPR IS USED BY EVERYONE WHEN IT COMES TO RESTARTING THE HEART CIRCULATION AND RESPIRATION.FOX EXAMPLE IN THE VIDEO ABOVE.
Tuesday, 22 March 2011
TECHNICAL DRAWING
Today we learnt how to draw to scale from louise in room 84, first we had to go threw plans and elevations
of a house and talk about the basic symbols used in technical drawings. After that we got our papers and
we had to draw elevations of a brick jst to get used to drawing and we have to hand it in on the 6th
of April.
Monday, 21 March 2011
SAWSTOOL PRACTICAL...
Today i was chiseling the angel 1:3 foe the legs to fit in after that i cut the angels for the legs then fixed the legs in to the top of the stool then hammered it in now the only thing that is left is the cleats.
7 stages of constuction
21/03/2011
today richie was talking about the 7 stages of construction, he explained the topic in details and saved what we learned into moodle.http://moodle.unitec.ac.nz/mod/resource/view.php?inpopup=true&id=54567
today richie was talking about the 7 stages of construction, he explained the topic in details and saved what we learned into moodle.http://moodle.unitec.ac.nz/mod/resource/view.php?inpopup=true&id=54567
Sunday, 13 March 2011
PUSSY_CAT_CCS_CARPENTRY
NEW START NEW BEGGINING FOR THE YEAR,THIS CLASS HAS BEEN SOLID ASS YEAH PUSSY_CAT_CCS_CARPENTRY 4LYF!!!!